Lorin W. Brown
235 Lamplighter Lane,
Mount Holly, NC 28120 704-915-0527
lorinwade@gmail.com
Summary
Nokia
Certified with a background as an Engineer and Integrator. Recently moving
into Field and Construction management; I'm looking for a similar, great
opportunity to demonstrate my skills, knowledge, and ability to progress.
Certifications – Nokia PTID 001AANS0038816
Nokia 2G,
3G Flexi, AWS1900 2100 / LTE / Process Surveys
Programs
●
Nokia BTS
Site Managers
●
Anritsu
Site Master and HHST
●
RFS
Management
●
Andrews
Lite
●
Nokia OSS,
RNC
●
Word,
Excel, Outlook, FrontPage, PowerPoint
●
Account
Management, Ticketing and Cue Systems
Relevant
Experience / Projects
Field
Manager (CFM) - Nokia Siemens Network [NSN]
03/13 -08/2013
Houston,
TX
· Manage new construction
and integrations of Modernization of TMO AWS and LTE sites.
· Problem resolution
· Pre-construction site
walks
· Maintain quality market
standards through audits and on-site management of construction provided by
vendor GC
· Daily reporting of
on-going site constructions and client status meetings
· Punch List reporting
and correction
· Safety regulation
NSN-TMO
FSMF Software Upgrades/Hardware Services - Lemcon
Networks
10/2012 -11/2012
Dallas, TX
· Short term project to
upgrade the LTE software on 2600 FSMF system modules, including testing for
factory defaults in hardware
NSN-TMO
Modernization – Lead Engineer / Integrator - Lemcon
Networks
05/2012 -08/2012
Houston,
TX
· Site audits and
surveys.
· Lead Technician
for Lemcon GC Installation Crew, acting as field supervisor
· Oversee site
construction by GC, making sure construction drawings are followed
· DC power cabling, T1
and Ethernet runs
· Fiber testing of trunk
and hybrid cables, testing system dB loss.
· Software upgrades,
commissioning and integration of new system and radio modules
· Site Cutovers
· Provide GDC support for
GC on service impacting actions i.e. Sector locks, antenna swaps
NSN-TMO
AWS 1900 2100 and Optimization Trial - Nokia Siemens
Networks
01/2012 -03/2012
Seattle,
WA
· BTS System Module and
Radio Software Version Upgrades
· Worked closely with
Tower Crew, Bridge, and NOC on site during maintenance window to
complete cutover , integration and commissioning of the initial test sites
· Complete both 2G and 3G
call tests: testing voice, data, and SMS, included testing network handovers,
sector to sector and tower to tower
T-Mobile
LTE Trial - Nokia Siemens
Networks
11/2011
Belleview
/ Bellingham WA
· Worked closely with NSN
Light Square in troubleshooting field issues with LTE.
· Installation of
testing Node cells in T-Mobile RF Lab and Handset Lab
· Provided transport from
Routers to Nodes
· Updating of
commissioning files and software versions
Field
Technician
- T-Mobile
6/2011 – 9/2011
Chicago,
IL
· HSPA42 Optimization
project
· Remote troubleshooting,
reconfigurations, and commissioning
· Routine site visits for
maintenance
· Working closely with RF
Department to improve service of Chicago/Milwaukee Markets
· Upgrading AISG RET
software to bring RET software up to date
· Isolate and resolve
complex RET and MHA issues
·
Adjust
electrical down tilt/up tilt per needed requests to improve coverage area
·
GNIC
Engineer
- Nokia Siemens
Networks
3/2011–4/2011
Dallas,TX
· NSN GNIC project
updating and optimizing IUB parameters for both BTS and COCO
RNC
upgrades through markets nationwide
· Define new traffic
descriptors and termination points according to prescribed data
· Troubleshooting top
offender BTS sites
Field
Engineer - Lemcon
Networks
07/2010 – 03/2011
Atlanta \
Houston \ Spokane
· HSPA+ Optimization
Project for T-Mobile
· Software upgrades,
re-commissioning, and troubleshooting of 3G equipment
· Reconfiguration of UMTS
Sectors, RETs, and MHAs
· Troubleshooting and
swaps of system modules including FRIAs, FSMB, and FSMEs
· Software upgrades,
re-commissioning, and troubleshooting of 3G equipment
· Troubleshooting of
system modules and antennas, assigning tower crews as needed
· Site Sweeps for DTF RL
and Site RL
Nokia 3G Flexi Installer - World Wind Wireless
02/2010 – 06/2010
Chicago IL
TMO HSPA Project
· Installation of Nokia
3G Flexi FSMD/E system units and radio modules
· HSPA and 2ND Carrier
Stand Alone installations and integrations
· Mount H-frames, Wall
Mounts, or Mono Poles as needed
· Rectifier installations
on AC powered sites
· Commissioning of BTS
modules
· Collection and
transmission of site folder including site reports of Alarms, Events, Backup
Commissioning files and pictures
· Complete test calls for
voice, data, and sms, E911, network handovers, sector to sector, and
tower to tower
Other Training ATT Quality Workmanship
Training